Span Of Md. Bridge Getting Fresh Coat Of Paint

STEVENSVILLE, Md. (AP) — The westbound span of the Chesapeake Bay Bridge is getting a makeover.

A $19.5 million project is under way to repaint the bridge in its signature shade of gray. Maryland Transportation Authority spokeswoman Teri Moss says most of the work is scheduled to be performed form the water to minimize the effect on traffic.

This is the first complete repainting of the bridge span since it opened in 1963. The first phase of the project includes cleaning and painting the bridge’s girders to bolster its structural integrity. The second phase involves cleaning and painting its suspension spans and towers.

Moss says there are other preservation and maintenance tasks that could cause lanes on the bridge to close.

The project is scheduled to be competed in fall 2012.

(Copyright 2011 by The Associated Press. All Rights Reserved.)

Comments

One Comment

  1. Mike says:

    The westbound span opened in the early 1970’s. The eastbound span opened in the early 1950’s/ Still painting is always nice though/

  2. Wheres common sense when you need it says:

    and for just 8 bucks, you can see it!

Leave a Reply

Please log in using one of these methods to post your comment:

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

More From CBS Baltimore

Track Weather On The Go With Our App!
Your Podcast Network Play.it

Listen Live