BALTIMORE (AP) — Maryland transit officials say the closure of the Baltimore metro system that began last week is necessary because of “unexpected wear” discovered on 11 sections of elevated track.

The Maryland Transit Administration said in a news release Thursday that one of the factors used in calculating rail wear exceeded internal standards. The agency says that’s something that can lead to a train derailment.

The MTA initially announced Sunday that the Metro SubwayLink would remained closed following a weekend inspection of the entire 15.5-mile (25-kilometer) route. The agency on Thursday posted the inspection report that led to the closure online .

Emergency funding is paying for shuttle bus bridges along the route while track repairs are conducted.

The news release says repairs will continue through March 11.

Follow @CBSBaltimore on Twitter and like WJZ-TV | CBS Baltimore on Facebook

(© Copyright 2018 The Associated Press. All Rights Reserved. This material may not be published, broadcast, rewritten or redistributed.)

  1. Like who knew that steel wheels running on steel tracks would cause wear? Maybe they should start routine maintenance of the system to stay on top of the problem instead of waiting to be surprised.

Leave a Reply

Please log in using one of these methods to post your comment:

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

More From CBS Baltimore

Track Weather On The Go With Our App!
CBS All Access
Download Our App

Watch & Listen LIVE